Home > Biogas >

2014 Newest High Quality Biogas Equipment

Categories Home Using Biogas Digester
Place of Origin: Chongqing
Brand Name: ALFA
Certification: CE
Model Number: Mola-B-S4
MOQ: 1set
Packaging Details: Cartons
Delivery Time: Within 15 days
Payment Terms: T/T,WesternUnion
Supply Ability: 300 Sets /Month
  • Product Details
  • Company Profile

2014 Newest High Quality Biogas Equipment

Specification

1.Biogas system

2.Long service life

3.Low maintenance cost

4.Environment-friendly


The Biogas Plant of double diaphragm is made of high-strengthened, high-elastic synthetic engineering diaphragm and of perfect anti-acid and anti-corrosion ability. Its capacity of absorbing the ambient heat and storing it is 30% higher than that of other material.


The Biogas Plant is made by adopting technology of combining internal digester and external protector. In this way ,it not only minimizes the possibility of doing damage to the internal digester, prolong its lifespan, and also create an complete Oxygen-free room for anaerobic micro organisms to do fermentation, which in return increases the Biogas Output ratio.

Product parameter

Advantage

1.Economic and durable, low price, less investment

2.Light weight, folding, small volume, convenient transportation and carrying

3.The technology of the whole equipment series can also be customized

4.Health environmental protection, no pollution

5.The equipment is very safe

6.Installation is simple and quickp;

Biogas System Produce Line

Testing&Installing

Packing&Shipping

Equipment for biogas system

After-sale guide

Try our EASY FIXES before calling a technician

Has the biogas stopped?

• Check the level of the top drum to see if there is biogas.

• Check your phone for a message that your biogas credit has run out.

Is the stove flame low or is the lamp dim?

• Make sure all valves are fully open.

• Check the level of the top drum to see if there is biogas.

• Make sure that fresh dung has been loaded.

• Check all hosepipe for kinks.

• Make sure the appropriate weight is on top of the digester.

Is the biogas system overflowing from the sides?

• Check the outlet valve for blockages and clean out any dried cow dung.

Is the dung not going into the biogas system?

• Make sure the outlet is clear

• Try to load it again in 5 hours or when the top drum rises 1 foot.

Are you having trouble paying for biogas?

• Call Takamoto Biogas 0738-689-788. We are open Monday to Friday 9am to 5pm.

Are you still having a problem?

• If you have tried our quick fixes but are still having a problem, call Takamoto Biogas 0738-689-788. We are open Monday to Friday 9am to 5pm.


Quality 2014 Newest High Quality Biogas Equipment for sale
Send your message to this supplier
 
*From:
*To: Chongqing MOLA Energy Technology CO.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
You may also be interested in :
Inquiry Cart 0
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
  • Submit Buying Request
    Contact Us Quickly